Integrated designing
Integrated designing

in Power Industry and other industries

Integrated automation
Integrated automation

of processes and process productions

Pre-design diagnostic study, power process audit
Pre-design diagnostic study, power process audit

of power objects and engineering infrastructure

Industrial safety inspection, tests and diagnostics
Industrial safety inspection, tests and diagnostics

of mechanical and electrical equipment

Engineering guiding
Engineering guiding
of water treatment and water-chemical mode of heat power equipment, chemical and analytical studies, metrological supply, qualification of working places
Assembling, adjustment, service, repair
Assembling, adjustment, service, repair
assembling, pre-commissioning, operational tuning, service maintenance, repair
Production
Production

of pressure sensors, control and management systems, high-voltage frequency converters, complete pump stations, etc.

 

Reference list on designing and construction guiding

Projects 2005-2008

 

Works

Customer Enterprise

Installation design of "Foit" hydrocouple on feed water and network pumps

Ziansk State District Power Plant, Naberezhnye Chelny Thermal Power Plant,  Nizhnekamsk Thermal Power Plant

Rehabilitation of substation-220/110/35/6 kV "Suleevo", "Studenets" Atomic Power Station

 

Bugulma electrical networks

Introduction design of "Vacon" frequency transducers on network pumps

Nizhnekamsk Thermal Power Plant, Kazan Thermal Power Plant-3, pump stations Nos. 2, 5 of Nizhnekamsk division maintenance force (Kazan heating networks)

Rehabilitation of open distribution system, closed distribution system, etc., with replacement of electric equipment. Modern equipment protection is executed with application of microprocessor engineering instead of electromechanical devices.

 

Kazan Thermal Power Plant-3, Nizhnekamsk Thermal Power Plant, Urussu State District Power Plant, Ziansk State District Power Plant,  Kazan electrical networks, Yelabuga electrical networks

Development of feasibility report "Rehabilitation of Kazan Thermal Power Station-1 with building a combined-cycle plant"

 

Kazan Thermal Power Plant-1

Detail design "Upgrading of the third stage of water demineralization"

 

Ziansk State District Power Plant

Detail design "Rehabilitation of gas distribution point Nos.1, 2 and gas pipelines on Nizhnekamsk Thermal Power Plant (hard- and software complex-1, 2), gas distribution point No.3 on Kazan Thermal Power Plant-3, gas distribution point No.2 on Zainsk State District Power Plant"

 

Nizhnekamsk Thermal Power Plant

Kazan Thermal Power Plant-3,

Ziansk State District Power Plant

Detail design for 110/6 kV substation "Sidorovka"

Naberezhnye Chelny electrical networks

Detail design «Rehabilitation of 110kV (5 cells) open distribution system, 6 kV closed distribution system of substation-15 "Pismyanka"

 

Bugulma electrical networks

Detail design "Rehabilitation of substation-220 kV "Nizhnekamsk open distribution system -110 kV"

 

 

Nizhnekamsk electrical networks

Detail design "Construction of 2 chain 110/35kV high-voltage transmission line "Kuchukovo-Chekalda"

 

Yelabuga electrical networks

Development of feasibility report "Construction of a combined-cycle plant-230"

Ziansk State District Power Plant

Development of feasibility report for Kazan Thermal Power Plant-3 expansion with installation of combined-cycle plant PGU-190

 

Kazan Thermal Power Plant-3

Development of feasibility report "Construction of two combined-cycle plants PGU-95"

Yelabuga Thermal Power Plant

220/110/35/6kV substation "Abdrahmanovo" 110kV open distribution system (2 stage) 2nd design stage

Almetyevsk electrical networks

Detail design "Rehabilitation of 35kV substation "Severnaya" transition to 110 kV"

Kazan Thermal Power Plant-2

Construction of regional boiler houses "Azino", "Savinovo" with hot water boilers PTVM-180, GVGM-180 and steam boiler DE-25

Kazan heating networks

Detail design of construction for open distribution system-220 with two automatic transformers (2x125MVA capacity)

Kazan Thermal Power Plant-3

“Project stage”. Gas distribution point Nos. 1, 2, 3, 4 110-220/6kV with feeding valve 110-200kV of electric supply circuit for  oil refinery and oil chemistry plant complex “TANEKO”, OJSC  

“Taneko”, OJSC

A design of automated control system of electric supply for oil refinery and oil chemistry plant complex “TANEKO”, OJSC

“Taneko”, OJSC

Execution of construction design for Secondary Distribution Switchgear 220 and 110kV for oil refinery and oil chemistry plant complex “TANEKO”, OJSC

“Taneko”, OJSC

“Project stage”. Electric supply on the site. Cogeneration installation (without  Secondary Distribution Switchgear ) Oil refinery and oil chemistry plant complex “TANEKO”, OJSC

“Taneko”, OJSC

“Project stage”. 110-220/6kV power transmission line with 220-110-kV feeding valve of external electric supply circuit of oil refinery and oil chemistry plant complex “TANEKO”, OJSC inculding “Project stage” development for 220kV power transmission line “Kama-Complex” through the Kama river.

 

“Taneko”, OJSC

“Project stage”. Heating networks from Nizhnekamsk Thermal Power Plant border including heat points up to the border of oil refinery and oil chemistry plant complex “TANEKO”, OJSC

 

“Taneko”, OJSC

Rehabilitation of cooling tower No.1 with its change-over to film-type flushing

 

Naberezhnye Chelny Thermal Power Plant

Rehabilitation of cooling tower with application of polymer constructional materials

 

Nizhnekamsk Thermal Power Plant (hardware and software complex-1)

Rehabilitation of cooling tower BG-1600, st. No.1

Petrozavodsk Thermal Power Plant, “TGK-1” “Karelenergogeneratsia”, OJSC