Works |
Customer Enterprise |
|
Installation design of "Foit" hydrocouple on feed water and network pumps |
Ziansk State District Power Plant, Naberezhnye Chelny Thermal Power Plant, Nizhnekamsk Thermal Power Plant |
|
Rehabilitation of substation-220/110/35/6 kV "Suleevo", "Studenets" Atomic Power Station
|
Bugulma electrical networks |
|
Introduction design of "Vacon" frequency transducers on network pumps |
Nizhnekamsk Thermal Power Plant, Kazan Thermal Power Plant-3, pump stations Nos. 2, 5 of Nizhnekamsk division maintenance force (Kazan heating networks) |
|
Rehabilitation of open distribution system, closed distribution system, etc., with replacement of electric equipment. Modern equipment protection is executed with application of microprocessor engineering instead of electromechanical devices.
|
Kazan Thermal Power Plant-3, Nizhnekamsk Thermal Power Plant, Urussu State District Power Plant, Ziansk State District Power Plant, Kazan electrical networks, Yelabuga electrical networks |
|
Development of feasibility report "Rehabilitation of Kazan Thermal Power Station-1 with building a combined-cycle plant"
|
Kazan Thermal Power Plant-1 |
|
Detail design "Upgrading of the third stage of water demineralization"
|
Ziansk State District Power Plant |
|
Detail design "Rehabilitation of gas distribution point Nos.1, 2 and gas pipelines on Nizhnekamsk Thermal Power Plant (hard- and software complex-1, 2), gas distribution point No.3 on Kazan Thermal Power Plant-3, gas distribution point No.2 on Zainsk State District Power Plant"
|
Nizhnekamsk Thermal Power Plant
Kazan Thermal Power Plant-3,
Ziansk State District Power Plant |
|
Detail design for 110/6 kV substation "Sidorovka" |
Naberezhnye Chelny electrical networks |
|
Detail design «Rehabilitation of 110kV (5 cells) open distribution system, 6 kV closed distribution system of substation-15 "Pismyanka"
|
Bugulma electrical networks |
|
Detail design "Rehabilitation of substation-220 kV "Nizhnekamsk open distribution system -110 kV"
|
Nizhnekamsk electrical networks |
|
Detail design "Construction of 2 chain 110/35kV high-voltage transmission line "Kuchukovo-Chekalda"
|
Yelabuga electrical networks |
|
Development of feasibility report "Construction of a combined-cycle plant-230" |
Ziansk State District Power Plant |
|
Development of feasibility report for Kazan Thermal Power Plant-3 expansion with installation of combined-cycle plant PGU-190
|
Kazan Thermal Power Plant-3 |
|
Development of feasibility report "Construction of two combined-cycle plants PGU-95" |
Yelabuga Thermal Power Plant |
|
220/110/35/6kV substation "Abdrahmanovo" 110kV open distribution system (2 stage) 2nd design stage |
Almetyevsk electrical networks |
|
Detail design "Rehabilitation of 35kV substation "Severnaya" transition to 110 kV" |
Kazan Thermal Power Plant-2 |
|
Construction of regional boiler houses "Azino", "Savinovo" with hot water boilers PTVM-180, GVGM-180 and steam boiler DE-25 |
Kazan heating networks |
|
Detail design of construction for open distribution system-220 with two automatic transformers (2x125MVA capacity) |
Kazan Thermal Power Plant-3 |
|
“Project stage”. Gas distribution point Nos. 1, 2, 3, 4 110-220/6kV with feeding valve 110-200kV of electric supply circuit for oil refinery and oil chemistry plant complex “TANEKO”, OJSC |
“Taneko”, OJSC |
|
A design of automated control system of electric supply for oil refinery and oil chemistry plant complex “TANEKO”, OJSC |
“Taneko”, OJSC |
|
Execution of construction design for Secondary Distribution Switchgear 220 and 110kV for oil refinery and oil chemistry plant complex “TANEKO”, OJSC |
“Taneko”, OJSC |
|
“Project stage”. Electric supply on the site. Cogeneration installation (without Secondary Distribution Switchgear ) Oil refinery and oil chemistry plant complex “TANEKO”, OJSC |
“Taneko”, OJSC |
|
“Project stage”. 110-220/6kV power transmission line with 220-110-kV feeding valve of external electric supply circuit of oil refinery and oil chemistry plant complex “TANEKO”, OJSC inculding “Project stage” development for 220kV power transmission line “Kama-Complex” through the Kama river.
|
“Taneko”, OJSC |
|
“Project stage”. Heating networks from Nizhnekamsk Thermal Power Plant border including heat points up to the border of oil refinery and oil chemistry plant complex “TANEKO”, OJSC
|
“Taneko”, OJSC |
|
Rehabilitation of cooling tower No.1 with its change-over to film-type flushing
|
Naberezhnye Chelny Thermal Power Plant |
|
Rehabilitation of cooling tower with application of polymer constructional materials
|
Nizhnekamsk Thermal Power Plant (hardware and software complex-1) |
|
Rehabilitation of cooling tower BG-1600, st. No.1 |
Petrozavodsk Thermal Power Plant, “TGK-1” “Karelenergogeneratsia”, OJSC |