Works |
Objects |
|
Automatic Regulation System of Frequency and Power for 200 MW power units, st. Nos. 2, 4, 7, 8, 11, 12 based on “Ovation” hardware and software (Emerson) |
Ziansk State District Power Plant
|
|
Full-scale Automated Process Control System of DKVR gas-fuel oil boilers 10/13 Nos.1, 2, 3 based on hardware and software «KRUG-CONTRAST» |
Gas-fuel boilers at Oil and gas Production Department “Jalilneft” |
|
Development and introduction of telemechanic groups “Yug-System” |
Ziansk State District Power Plant,
Nizhnekamsk Hydraulic Power Plant,
Naberezhnye Chelny Thermal Power Plant,
Kazan Thermal Power Plants -1, 2, 3 |
|
Full-scale automated process control system for 50MW gas-turbine plant based on “Ovation” hardware and software (Emerson) |
Êàçàíñêàÿ ÒÝÖ-1 |
|
Introduction of Automated Systems of Power Resources Commercial Accounting, remote control systems, communication equipment |
110/6kV Novokremlevskaya substation, Kazan electrical networks |
|
Automated Process Control System of “VOIT” hydraulic coupling control based on hardware and software complex “Siemens” |
Naberezhnye Chelny Thermal Power Plant,
Nizhnekamsk Thermal Power Plant-1
|
|
Automated Process Control System of boiler unit st.N5 based on hardware and software complex “KRUG-TREI” |
Republic of Kazakhstan, Aktau, Thermal Power Plant -1 |
|
Sub-system of automatic ignition of boiler unit st.N7 TGM-161-M (200t/h) based on hard- and software complex “Amaks” |
Republic of Iraq, Najibia Thermal Power Plant |
|
Full-scale automated process control system for 500MW power units based on “Ovation” hardware and software (Emerson) |
Republic of Kazakhstan, Ekibastuz, State District Power Plant -1 |
|
Automated Process Control System for power unit No.2 |
Russia, Chelyabinsk Thermal Power Plant-3 |
|
Hardware and software complex of scheduling system for boiler houses |
Boiler houses of Almetyevneft Oil and Gas Production Department |
|
Development and introduction of automated control system of heat recourses commercial accounting |
Ziansk State District Power Plant,
Kazan Thermal Power Plant-1,
Naberezhnye Chelny Thermal Power Plant |
|
Development and installation of automated control system of energy resources accounting Heat resource and hot water metering units in apartment buildings |
Naberezhnye Chelny housing and public utilities
630 apartment buildings |
|
Process protection system and vibration velocity and mechanical value monitoring system for turbogenerators st. Nos. 5, 6, 7 (PT-60-130/13, R-50-130/13) |
Kazan Thermal Power Plant-1
|
|
Information and measurement system of 12 power units (power boiler units and turbogenerators) at Central Heating Switchboard 2 |
Nizhnekamsk Thermal Power Plant-2 |
|
Cross connection plant’s automated regulating system (3 boiler units BKZ-420 and 3 turbogenerators PT-60-130/13, PT-80/100-130-13) based on “Ovation” hardware and software (Emerson) |
Priuphimskaya Thermal Power Plant |
|
Full-scale automated process control system for soda recovery boiler unit SRK-350 based on SIMATIC PCS 7 (Siemens) |
Thermal Power Plant of Mariy pulp and paper mill (Mariy El) |
|
Automated control system of vibration and diagnostics for three 210MW turbogenerators based on “Ovation” hardware and software (Emerson) |
Republic of Kazakhstan, Aktau, Thermal Power Plant -3 |
|
Full-scale automated process control system for boiler unit (E-35) based on “Ovation” hardware and software (Emerson) |
Lidsk Thermal Power Plant (Belarus) |
|
Information analysis systems at Thermal Power Plant. Hydraulic Power Plants, State District Power Plants |
Ziansk State District Power Plant, Kazan Thermal Power Plant-1,2,3, Nizhnekamsk Hydraulic Power Plant, Naberezhnye Chelny Thermal Power Plant |
|
Analysis of equipment operating conditions and parameters in more than 800 central heat points of "MOEK", OJSC branches (Moscow), development of technical offers on designing of automatic regulation systems of process parameters with application of variable-frequency electric drives |
800 central heat points (Moscow)
|
|
Full-scale automated system for chemical department |
Kazan Thermal Power Plant-1, Ziansk State District Power Plant |
|
Rehabilitation of gas control units |
Nizhnekamsk Thermal Power Plant-1.2, Ziansk State District Power Plant |
|
Automated system of operating control for poultry meat department (based on Siemens equipment) |
Poultry meat department of “Chelny Broiler” poultry plant |
|
Development of automated process control system of electric energy resources commercial accounting (stage – technical design) for oil refinery and oil chemistry plant complex (central control rooms, 2 integrated distribution devices for electric energy supply 110, 220kV, 4 main step-down substations 110, 220/6kV, 50 distribution points, 150 transformer points) |
Oil refinery and oil chemistry plant complex
Nizhnekamsk city |
|
Automated Process Control System of 300MW power unit st.No. 1 based on hardware and software complex «OVATION» (Emerson) |
Aksu Thermal Power Plant (Kazakhstan) |